China Shipbuild
  | 
Skip Navigation Links
Ship BuildExpand Ship Build
ShippingExpand Shipping
 新造船 | 散货船 |  集装箱船 | 油轮及化学品船 | LNG/LPG 运输船 | 特种船及其他船型
 
 
 
 

1,400 TEU Container Feeder, LNG Fueled, Developed by Huangpu-Wenchong Shipyard

MAIN PARTICULARS

Length (o.a.) : 169.95 m
Length (b.p.) :  160.96 m
Bread moulded:   26.90 m
Depth moulded:   14.85 m
Design draught (Td): 8.50 m
Scantling draught (Ts):      9.60 m
Deadweight @ Ts:        19,500 ton

CONTAINER CAPACITY

On deck (6 tiers) :  844 TEU
In hold (5 tiers) :            536 TEU
Total: 1,380 TEU

MAIN ENGINE & SPEED

Main Engine: WIN GD 7RT-FLEX50DF T-III
Service Speed: 18.5 kn
Fuel Comsumption (Gas Model): 7,153 KJ/kWh

LNG FUELED

LNG Tank (Type C): 690 m3             
Endurance (LNG): 3200 nm
Endurance (HFO/MGO)  6500 nm

1,868 TEU Container Feeder, Bangkok type

  • Bangkok type
  • Hull form features S-BOW, optimized base on operation profile
  • Cargo holds for 3 tiers of 9’6” high cube + 2 tiers of 8’6”
  • Containerized dangerous goods of IMDG
  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : 171.95 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.30 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 9.50 m
Deadweight @ Ts:  23,750 ton

 

CONTAINER CAPACITY

In Hold / On Deck
626 / 1,286 TEU
Total
1,868 TEU
 Homogeneous 14t/TEU (T=9.75m) 1,290 TEU
Reefer plugs in hold / on deck: 50 / 180 FEU
Reefer (total): 230 FEU

MAIN ENGINE & SPEED

Main Engine: WinGD 6RT-flex58T-E Tier II, 1 set
Service Speed: 18.5 kn
Fuel Comsumption:     40.2 t/d

 EEDI Phase-III


1900 TEU Container Feeder, Gearless, Developed by Huangpu-Wenchong Shipyard

  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : abt. 172.00 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.60 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 10.00 m
Deadweight @ Ts:  24400 ton

CLASS NOTATION

- DNVGL +1A Container Ship, COAT-PSPC(B), LCS, BIS, E0,BWM(T), Recyclable, Clean,TMON(oil lubricated), DG(P),

CONTAINER CAPACITY

On deck (7 tiers) 1,286 TEU
In hold (5 tiers)  644 TEU
Total   1,930 TEU
   
Reefer (on deck): 200 FEU
Reefer (in hold): 20 FEU
Reefer (total): 220 FEU

MAIN ENGINE & SPEED

Main Engine: MAN B&W 6S60ME-C10.5
Service Speed: 18.5 kn
Fuel Comsumption:     35.62 t/d

Orderbook   (* the orderbook for reference only, details please contact with the shipyard !)
No.Ship's Name / Hull No.Vessel TypeOwner CompanyShipyardDeliveryContract Date
1CIMC Nantong S1165Container Ship, 1,800 teuDanaos ShippingCIMC Sinopacific (SOE)2028 - 092025 - 11
2CIMC Nantong S1167Container Ship, 1,800 teuDanaos ShippingCIMC Sinopacific (SOE)2029 - 032025 - 11
3CIMC Nantong S1162Container Ship, 1,800 teuDanaos ShippingCIMC Sinopacific (SOE)2027 - 122025 - 11
4CIMC Nantong S1163Container Ship, 1,800 teuDanaos ShippingCIMC Sinopacific (SOE)2028 - 032025 - 11
5CIMC Nantong S1166Container Ship, 1,800 teuDanaos ShippingCIMC Sinopacific (SOE)2028 - 122025 - 11
6CIMC Nantong S1164Container Ship, 1,800 teuDanaos ShippingCIMC Sinopacific (SOE)2028 - 062025 - 11
7Fujian MaweiContainer Ship, 1,600 teuMPC GroupFujian Southeast Shipbuilding2027 - 092025 - 10
8Fujian MaweiContainer Ship, 1,600 teuMPC GroupFujian Southeast Shipbuilding2027 - 122025 - 10
9Huangpu Wenchong H2657Container Ship, 1,900 teuLatsco Shipping LimitedHuangpu-Wenchong Shipbuilding2028 - 062025 - 10
10Huangpu Wenchong H2658Container Ship, 1,900 teuLatsco Shipping LimitedHuangpu-Wenchong Shipbuilding2028 - 082025 - 10
11CMJL NanjingContainer Ship, 2,280 teuErnst RussChina Merchants HI, Jinling2028 - 122025 - 09
12CMJL NanjingContainer Ship, 2,280 teuErnst RussChina Merchants HI, Jinling2028 - 082025 - 09
13Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2029 - 012025 - 09
14Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2027 - 122025 - 09
15Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2028 - 032025 - 09
16Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2028 - 042025 - 09
17Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2028 - 062025 - 09
18Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2028 - 072025 - 09
19Span Asia Go 201Container Ship, 500 teuPhilippine Span Asia CarrierLinhai Huipu Shipbuilding2026 - 082025 - 09
20Seatrade AntiguaContainer Ship, 1,747 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2028 - 042025 - 09
21Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2027 - 112025 - 09
22Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2028 - 112025 - 09
23Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2027 - 102025 - 09
24Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2027 - 102025 - 09
25Fujian MaweiContainer Ship, 1,800 teuEastern Pacific ShippingFujian Southeast Shipbuilding2028 - 052025 - 09
Records: 207,   Page: 1  2  3  4  5  6  7  8  9  



如果您有意建造新船,请留言并留下您的联系方式:
 
chinashipbuild.com 2026