China Shipbuild
  | 
Skip Navigation Links
Ship BuildExpand Ship Build
ShippingExpand Shipping
 Ship Building | Fleet
 
TS Lines books 7,000 TEU boxship quartet at SWS (2021-07-06)
Taiwanese shipping line TS Lines has placed an order for the construction of four 7,000 TEU containerships with Shanghai Waigaoqiao Shipbuilding.

The 7,000 TEU containerships, independently designed by Shanghai Merchant Ship Design & Research Institute (SDARI), will feature environmental design concepts resulting in high efficiency and energy saving.

They will be 272.5 meters long, 42.8 meters wide, and be compliant with the Tier III and EEDI Phase III requirements.

TS Lines operates a fleet of 46 containerships with a total capacity of close to 100,000 TEU, engaged predominantly in trading in the Asian region.

As informed, with this contract the company has more than 10 orders for 7,000 TEU containerships, which has effectively consolidated its market share in the medium-sized container ship segment.
MSC placed an order at CSSC for thirteen 16,000 teu container vessels (2021-05-11)
Mediterranean Shipping Co (MSC) placed an order at China State Shipbuilding Corporation (CSSC) for thirteen 16,000 teu container vessels, valued in excess of Y10bn ($1.52bn).

MSC signed up for 13 vessels at Dalian Shipbuilding Industry Co (DSIC) and Guangzhou Shipyard International (GSI) with a price tag of $120m each. The entire series will be delivered in 2023 and 2024.

The deal, described as the single largest containership order accepted by state-run CSSC, will see the company’s subsidiaries DSIC and GSI build seven and six scrubber-fitted vessels respectively.

The 366 m long vessels, designed by CSSC 708 Institute, will be LNG-ready.

“The successful acquisition of this order has allowed the Chinese-made independent brand to make another brilliant appearance in the international market,” CSSC said.

CSSC has also recently been confirmed as Seaspan’s shipbuilder of choice for six 15,500 teu scrubber-fitted boxships, scheduled to start delivering in the second half of 2023.

As for MSC, these latest deals ensure the company has the second largest containership orderbook in the world after Taiwan’s Evergreen.
TS Lines orders 2+2 1,900 teu container ships at Huangpu Wenchong (2020-09-14)
Taiwanese feeder boxship operator TS Lines has entered into shipbuilding contracts with Huangpu Wenchong Shipbuilding for the construction of up to four 1,900 teu containerships. The contracts include firm order for two vessels and options for another two vessels.

The vessels will adopt Huangpu Wenchong’s bangkokmax design and will be equipped with scrubbers. Delivery is scheduled in the third and fourth quarters of 2022 and the price for each ship is $22.8m.

Following delivery, the vessels will be deployed for shipping service in Southeast Asia.

TS Lines already has two 2,700 teu boxships under construction at Huangpu Wenchong. According to Alphaliner data, TS Lines currently operates 45 ships with a total capacity of 98,989 teu, of which 13 ships are self-owned.
910 Reefer Container Ship Launching at CSSC Chengxi Shipyard (2020-08-26)
August 26, the first 910RFEU feeder refrigerated container ship built by Chengxi Shipyard US ship owner Dole was launched successfully.

The 910RFEU container ship is a green and environment-friendly ship has a length of 195 meters, a width of 32.2 meters, a depth of 17 meters, a design draft of 10.5 meters, a service speed of 19.5 knots, a designed deadweight of 28,750 tons, which can meet the requirements of unlimited navigation area, and the number of reefers can reach 910.

A large quantity of cold box, the ship loading of flexible, easy to maintain, meet the TIER Ⅲ discharge and SOx requirements as well as the Suez Canal and the panama canal current rules, the US coast guard and the federal about noise pollution prevention rules and standards such as vibration, which reached the international advanced level.

The successful launch of no. 910RFEU feeder reefer container ship marked the Chengxi Shipyard successful entry into the feeder reefer container construction market.
CSBC to receive orders worth $485m from TS Lines, (2015-06-26)
China Shipbuilding Corporation (CSBC), the only listed shipbuilder in Taiwan, expects to receive orders for 10 3,000 teu container ships and four 1,800 teu container ships from TS Lines and Evergreen, respectively, in July. The orders value a total of TWD15 billion (USD485 million), said CSBC general manager Chen Feng-lin. Although CSBC’s current price of the 3,000 teu box ships is set at USD35 million each, the actual price of the box ships ordered by Evergreen could be higher because the carrier has higher standard requirements, added Chen. CSBC has completed negotiations with TS Lines, and the builder expects TS Lines to place its order earlier than Evergreen, said Chen. According to Chen, SITC Line has also expressed its intention to place new orders at CBSC, following the delivery of one of 12 1,800 teu container ships it ordered at CSBC.
Jinhai Heavy Industry to deliver 8,800 teu (2015-06-26)
Jinhai Heavy Industry (JHI), a shipyard affiliated with China’s HNA Group, expects to deliver its first 8,800 teu container ship newbuilds and a jackup offshore construction vessel within 2015, a statement of the yard said on 25 June. The box ships’ owner is SinOceanic Shipping, according to IHS Maritime’s Sea-web.com. SinOceanic Shipping has 10 same-class box ships under construction at JHI. In addition, the shipyard delivered Tianjin, the third of its first batch of very large crude carrier (VLCC) newbuildings on 25 June, said the yard. The VLCC was delivered to HNA Group International, according to IHS Maritime’s Sea-web.com. The delivery of Tianjin followed that of Shanghai, which was delivered on 6 June. JHI still has two same-class VLCCs launched and waiting for deliveries, according to IHS Maritime’s Sea-web.com. As of 25 June, the yard has a total of 19 newbuildings under construction, including box ships, bulk carriers, offshore vessels, and crude tankers.
HHI wins CMA CGM ULCS order (2015-06-09)
South Korea’s Hyundai Heavy Industries (HHI) has won a new order for a series of ultra large container ships from French operator CMA CGM. The six 14,000 teu vessels are to be built at Hyundai’s Ulsan facility with deliveries pencilled in from early 2017. The boxships’ main particulars are overall length of 366 m, a beam of 48.2 m, and a draft of 16m. Marseilles-headquartered CMA CGM currently have a further seven vessels on order at three different shipyards: the 18,000 teu CMA CGM Bougainville is due to be delivered next month from the Samsung shipyard; three 18,000 teu vessels chartered to CMA-CGM from CSSC HKG are being built at the Shanghai Jiangnan Changxing shipyard with deliveries scheduled for late 2015; and three 20,600 teu vessels ordered in April 2015 at the HHIC-Phil shipyard are to be delivered in the second half of 2017.
Delphis adds box ships at HHIC (2015-06-09)
Belgian boxship owner and operator Delphis has extended an existing boxship order at Hanjin Heavy Industries & Construction (HHIC) in South Korea. Delphis originally ordered two 1,900 teu vessels in November 2014 and has now added a further two vessels of the same type. The latest ships are due for delivery in November 2016 and February 2017. All four vessels are being built to a high specification including LNG-ready facilities together with Finnish Swedish `1A Super` ice-class. They are being built by HHIC's Busan shipbuilding facility and on delivery are expected to be deployed in the Baltic trades.
HHIC delays deliveries of Capesizes, box ship (2015-06-04)
South Korean shipbuilder Hanjin Heavy Industries & Construction (HHIC) will be deferring the delivery of two Capesize bulkers and one container ship. HHIC made the revelations in Korea Exchange filings on 2 June. The Capesizes, worth KRW 116.9 billion (USD105.6 million) and the container ship, worth KRW86.7 billion, were ordered on 25 October 2013. The Capesizes, Mehmed Faith and Vittoria, were to be delivered by July. The delivery will be deferred to 28 August. The container ship was to have been delivered by 31 May but the date has been pushed back to 24 July. It did not reveal the customers' identity but said the owner of the two Capesizes is a Turkish company, while the owner of the container ship is a Liberia-registered company. IHS Maritime's Sea-web.com data suggest the owner is Ciner Ship Management. The data also show that Greek owner Cape Shipping ordered two 6,900 teu container ships from HHIC around October 2013 and are the vessels due for delivery in June and November 2015.
Maersk comes back to DSME for ULCS order (2015-05-10)
AP Moller-Maersk has returned to South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME) for its latest series of ultra-large container ships (ULCS). The new order calls for an initial six firm 20,000 teu vessels with options for a further four ships being attached to the contract. Booked for delivery during 2017, they are understood to have been priced at USD155 million per vessel. Both Hyundai HI and Samsung were also believed to be in the offing for this hotly contested contract. The latest order follows similar moves made by Maersk’s rivals CMA CGM, Mitsui OSK Lines and OOCL in ordering vessels of 20,000 teu capacity this year. The new Maersk order represents repeat business for DSME with the yard having won a well-publicised contract for 20 18,270 teu ‘Triple-E class’ box ships in 2011. The final three ships from this order are due to be delivered to Maersk within the next two months. DSME has also built previous series of ships for Maersk comprising 16 7,500 teu ships and four 8,000 teu vessels that were delivered between 2007 and 2013. DSME is presently building a drilling rig for the associated Maersk Drilling. According to IHS Maritime newbuilding data, Maersk presently has a further seven box ship newbuildings in its orderbook. This comprises a new design of 3,600 teu vessels ordered in March this year at Cosco Zhoushan in China. They are due for delivery in 2017 and are destined for operation in Maersk’s feeder services in the Baltic Sea. Other ocean carriers understood to be in the market for 20,000 teu plus class box ships are Cosco, Mediterranean Shipping Co (MSC), and Yangming. MSC, Maersk’s 50:50 partner in the new 2M Alliance, is expected to order an initial four such vessels that are likely to be contracted at Hyundai HI in the near future. Meanwhile, Cosco and Yangming, both members of the CKYHE alliance, are expected to place orders for up to 11 ships each.
Tsuneishi receives Handysize bulker orders (2015-05-03)
Japanese shipbuilder Tsuneishi said on 30 April that it has received orders to build a number of 38,300dwt bulk carriers. The ships, to be built based on Tsuneishi’s newly developed TESS38 design, would be constructed at the shipbuilder’s Cebu yard. Tsuneishi, led by Kenji Kawano, said it is the first order of the TESS38 design. The shipbuilder would not reveal the customer’s identity and the number of ships ordered when contacted by IHS Maritime. The shipbuilder began working on the TESS38 design in November 2014. The design was based on the existing TESS35, but with its length extended by 3 m to 180 m. This was to increase deadweight by 3,000 tonnes and thereby enhance transport efficiency. Based on a proprietary research into how existing ships plowing major shipping routes in the Pacific (including Asia) and Atlantic oceans are being used, TESS38 comes standard-equipped with a cargo securing device that can secure log onto the decks, which is a device often used when transporting log. TESS38 also has four deck cranes, and is built to improve cargo-handling efficiency and maintenance by having a hatch cover with a larger opening and a semi-box shaped hold area that is suited for transporting steel products. The design also features propulsion that is more efficient and an improved hull design to reduce wave and wind resistance. Tsuneishi decided to develop the design to meet the higher demand for transportation of raw materials due to economic development in Asia.
Seven Seaspan boxships for HHIC and China (2015-04-29)
Canadian shipowner Seaspan has placed orders for seven containerships with five at HHIC Subic Bay, Philippines and two at Chinese yards Jiangsu Xinfu and Jiangsu New Yangzi Shipbuilding at a total cost of USD653.5 million. The five 11,000 teu vessels at HHIC are scheduled for delivery in 2017 and cost about USD93.5 million each. Seventeen year charters with a leading operator have been fixed and at the end of the charter period, they will buy the vessels at an already agreed price. The two 10,000 teu vessels at Chinese yards Jiangsu Xinfu and Jiangsu New Yangzi Shipbuilding are of the fuel-efficient Saver design and have been ordered for delivery in 2017 at a cost of about USD93 million each.
HHIC secures MSC container ship quartet (2015-04-25)
South Korean shipyard Hanjin Heavy Industries and Construction (HHIC) has secured an order for four container ships from Mediterranean Shipping Co (MSC) to be built at its yard in Subic Bay, Philippines. The four 11,000 teu vessels are scheduled for delivery in 2017 and cost about USD80 million each. MSC plans to use these newbuildings on its north-to-south trade but needs 10 in total and will charter six more vessels. This year HHIC's Subic Bay yard has already won an 11,000 teu boxship order from Greek shipowners Costamare and three 20,600 teu vessels from French line CMA CGM. Costamare’s order is scheduled for delivery in December 2016 and it brought the total on order to seven. The CMA CGM order is expected in 2017.
'K' Line sells six box ships (2015-04-12)
Kawasaki Kisen Kaisha (‘K’ Line) has sold six container ships as it prepares to take delivery of 10 14,000 teu ships. Japan’s third-biggest shipping company told IHS Maritime that since the end of 2014 to March 2015, it has sold Victoria Bridge, Valencia Bridge, Virginia Bridge, Verrazano Bridge, Vincent Thomas Bridge, and Vancouver Bridge. Each ship is of 4,738-teu and built in 2004–05. IHS Maritime’s Sea-web.com data show Victoria Bridge, Valencia Bridge, and Virginia Bridge were sold for USD15.6 million each to Alexander Saverys-owned Delphis and have been renamed to Buffalo Hunter, Bear Hunter, and Bull Hunter. The data also show Verrazano Bridge, Vancouver Bridge, and Vincent Thomas Bridge were sold to South Korean operator Sinokor Merchant Marine for USD15 million each and were renamed to Sino Bridge, Beijing Bridge, and Grace Bridge. A ‘K’ Line representative told IHS Maritime, “We will take delivery of five 14,000 teu vessels from Imabari Shipbuilding within this year and also another five 14,000 teu ships in 2018.” ‘K’ Line said in its medium-term management plan that it plans to reduce its fleet of container ships from 70 to 61 by the end of fiscal year 2019. However, its teu capacity will increase with the sale and scrapping of the smaller ships, and the introduction of the 10 14,000 teu ships. Eizo Murakami, who took over as ‘K’ Line’s new CEO and president on 1 April, said the first half of the plan will focus on further strengthening the company’s financial position based on improved earning power while the last half will be dedicated to growth into strategically expanding businesses based on financial soundness.
OOIL orders six 21,100 teu box ships (2015-04-02)
Orient Overseas (International) (OOIL), the parent company of Orient Overseas Container Line (OOCL), has placed a new order for six 21,100 teu container ships at Samsung Heavy Industries for USD951.6 million. OOIL is currently arranging a bank loan to fund 70% of the costs of the newbuildings, with the remainder funded by its internal resources, a stock filing of the company said on 1 April. The contract price of each vessel is payable in cash in five equal instalments. The vessels are expected to be delivered in 2017, OOIL added. The new order is the first addition of new vessels for the company since 2014. In 2014, OOCL took delivery of two ‘Mega’ class 13,208 teu new vessels. It will also take delivery of four 8,888 teu vessels from Hudong-Zhonghua Shipbuilding in 2015. As part of the re-fleeting plan, one 9-year old and two 11-year old 8,063 teu SX Class vessels were sold and chartered back for a three-year period in 2015. “It is expected that trade growth in 2015 will outperform that of 2014, and bunker cost savings for the industry will become more apparent in 2015,” OOCL said in its annual financial result statement. “Notwithstanding the larger orderbook for delivery in the year 2015, we anticipate gradually improving industry dynamics and margin,” it added.
Cosco Zhoushan wins up to seven Maersk boxships (2015-03-30)
Chinese shipbuilder Cosco Zhoushan Shipyard has won an order for up to seven ice-class containerships from Denmark’s Maersk Line, which will be a first for the shipbuilder in the construction of containerships. The order is for five 3,600 teu feederships with an overall length of 200 m and the order has two options. Previous reports and recent sources indicate a cost of about USD39 million each. The vessels will be wide-beamed and are scheduled for delivery from March 2017. They are part of Maersk’s five-year USD15 billion fleet renewal plan and it is expected to place orders for additional newbuildings in 1H2015.
Yang Ming Marine back to profit in 2014 (2015-03-30)
Taiwanese carrier Yang Ming Marine reported a profit of TWD411 million (USD13 million) for the whole year of 2014, returning to black from the TWD2.9 billion loss in 2013, the stated company on 25 March. The carrier recorded TWD134.7 billion in revenue in 2014, up 13% year on year (y/y), and its earnings per share stood at TWD0.13. The company handled 3.97 million teu in 2014, up 11% y/y from the 3.56 million teu in 2013. The profit was attributed to the rising freight rates since the third quarter of 2014, which contributed to the increase of revenue. The company also benefited from the reducing oil price since the last quarter. In 2014, in order to meet market demand, Yang Ming promoted measures to save bunker consumption, adjusted the loading structure, and controlled cost strictly, which resulted in a 11% annual growth of cargo throughput but only 5% increase of operation cost, stated the carrier in its press release on 25 March. The carrier will explore new markets and cargo sources in 2015. With the deployment of 14,000 teu box ships and low oil price, the company is confident to make a better performance in 2015.
China COSCO's profit up 54% y/y on subsidies (2015-03-27)
China COSCO Holdings' profit jumped 54% year on year (y/y) to CNY362.5 million (USD58.5 million) on government subsidies for scrapping old tonnage. Excluding one-off gains, its loss narrowed 81% y/y to CNY1.4 billion due to slump in fuel costs and contraction of its chartered-in fleet, according to the company's stock filing on 27 March. In 2014, China COSCO sped up offloading of old tonnage with a total of 56 scrapping of bulk carriers and container ships at 3.1 million dwt, which resulted in government subsidies of CNY1.4 billion. In 2013, the government rolled out policies with subsidies to encourage Chinese shipowners to scrap China-flagged old vessels. The subsidies will be doubled if the shipowners order new tonnage at Chinese shipyards to match the depleted tonnage. China COSCO's revenue rose 4% y/y to CNY64.4 billion. In 2014, the company's operating box-ship fleet expanded 7% y/y to 840,692 teu for 175 box ships. It also chartered out five box ships with a capacity of 42,476 teu. Its orderbook for new container ships totalled 117,960 teu. China COSCO's bulker tonnage shrank 17% y/y to 23.4 million dwt as of end of 2014. It had 40 bulk carriers with a combined 3.5 million dwt capacity on order.
NYK devises energy-saving adjustments for box ship (2015-03-10)
Japan's Nippon Yusen Kabushiki Kaisha (NYK) and its subsidiary Monohakobi Technology Institute (MTI) have made energy-saving adjustments for container ships. The adjustments resulted in lowering carbon dioxide (CO2) emissions by 23% over six months, beating pre-test estimates. To reduce energy consumption, container ships often sail at a speed that is much slower than the average speed anticipated when the ship was designed and built. To make existing ships more energy-efficient at slower speeds, the NYK Group has been conducting research since the summer of 2013, studying measures such as remodeling the ship’s bulbous bow and installing MT-FAST. MT-FAST is an energy-saving device that greatly reduces fuel consumption. Its multiple blades are fitted ahead of the ship's propeller to reduce the swirl generated by propeller revolutions and thereby enhance propulsion efficiency. ClassNK verified the CO2 emissions based on data gathered six months after the adjustments were implemented in June 2014. The development of NYK's energy-efficient technology was supported by grants from the Maritime and Port Authority of Singapore’s Green Technology Programme and also supported by the ClassNK Joint R&D for Industry Program.
ULCS demand not enough to revalue Korean shipbuild (2015-03-10)
Although shippers intend to order ultra-large container ships (ULCSs) in which Korean shipbuilders command high market shares, the new orders are insufficient to raise earnings forecast for them, said an analyst in his research note. Samsung Securities analyst Young-soo Han said, 'Maersk at end-2014 stated its intention to resume ordering container ships soon. Japan’s Shoei Kisen Kaisha ordered 11 18,000 teu container ships from Imabari early this year, and MSC last week reportedly signed a letter of intent for four 11,000 teu container ships with Hanjin Heavy Industries & Construction. Hapag-Lloyd and Hamburg Sud are also reportedly negotiating with shipbuilders to order over 10,000 teu class container ships.' Han foresees the box ship order volume would increase 30% year on year to 1.2 million teu this year, which is similar to a five-year average. He analysed the solid growth of demand for container ships can be explained by the low base from 2014, lower fleet growth, and European shipping companies’ easier access to financing on the European Central Bank's quantitative easing programme. The analyst added, 'The ratio of order backlog to global fleet capacity also slid from 23% in January 2014 to 18% in January 2015.' He insisted that although increasing container ship orders would be positive to South Korean shipbuilders, new orders of 1.2 million teu container ships are not enough to raise earnings estimates and order assumption or to offset tepid offshore structure orders. 'If shipbuilding prices and order mix remains unchanged year on year and Korean big three shipbuilder – Hyundai Heavy Industries, Samsung Heavy Industries, and Daewoo Shipbuilding & Marine Engineering – maintain 34% market share, their container ship orders would amount to USD1.6 billion for each of them,' Han added. 'The figure is equivalent to our estimate of 11% of their annual order target and 14% of their 2014 new orders.'
Records: 102,   Page: 1  2  3  4  5  6  
 
chinashipbuild.com 2026